06079 Brindavan SF Special route and timetable

06079 Brindavan SF Special is a reserved special train from MGR Chennai Central (MAS) to KSR Bengaluru City Junction (SBC). It runs daily, leaves at 07:40 and reaches KSR Bengaluru City Junction at 13:45 the same day after 6 h 5 min, with 13 stops. Timetable as of September 2026.

Type
Special (reserved)
Runs on
Daily Days of departure from MGR Chennai Central
From
MGR Chennai Central (MAS) Departs 07:40
To
KSR Bengaluru City Junction (SBC) Arrives 13:45 on Day 1
Travel time
6 h 5 min
Stops
13
Timetable
As of September 2026

Track this train in the Taransit app.

Get it on Google Play

Route map of train 06079

Route of train 06079 Brindavan SF Special from MGR Chennai Central to KSR Bengaluru City Junction, 13 stopsMGR ChennaiCentralKSR Bengaluru City
See the route on the India map

Stops and times of train 06079

Stops of train 06079
#StationArrivesDepartsHaltDay
1MGR Chennai Central MAS07:40Day 1
2Arakkonam Junction AJJ08:3808:402 minDay 1
3Sholinghur SHU08:5809:002 minDay 1
4Walajah Road Junction WJR09:1309:152 minDay 1
5Katpadi Junction KPD09:3809:402 minDay 1
6Ambur AB10:1810:202 minDay 1
7Vaniyambadi VN10:3310:352 minDay 1
8Jolarpettai Junction JTJ10:5811:002 minDay 1
9Kuppam KPN11:4411:451 minDay 1
10Bangarapet Junction BWT12:0912:101 minDay 1
11Krishnarajapuram KJM12:5012:522 minDay 1
12Bengaluru Cantt. (Bangalore) BNC13:0813:102 minDay 1
13KSR Bengaluru City Junction SBC13:45Day 1

Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.

Spotted a wrong time? Email us

Questions about train 06079

What is the route of train 06079?

Train 06079 Brindavan SF Special runs from MGR Chennai Central (MAS) to KSR Bengaluru City Junction (SBC), with 13 stops.

On which days does train 06079 run?

Train 06079 leaves MGR Chennai Central daily.

What time does train 06079 leave MGR Chennai Central and reach KSR Bengaluru City Junction?

Train 06079 leaves MGR Chennai Central at 07:40 and reaches KSR Bengaluru City Junction at 13:45 the same day. Times are scheduled times in IST.

How long does train 06079 take?

Train 06079 takes 6 h 5 min from MGR Chennai Central to KSR Bengaluru City Junction.

Which stations does train 06079 stop at?

Train 06079 stops at 13 stations: MGR Chennai Central, Arakkonam Junction, Sholinghur, Walajah Road Junction, Katpadi Junction, Ambur, Vaniyambadi, Jolarpettai Junction, Kuppam, Bangarapet Junction and 3 more, listed in the stop table.

Track this train in the Taransit app.

Get it on Google Play

Free on Android