11140 Gadag - Mumbai CSMT Express route and timetable

11140 Gadag - Mumbai CSMT Express is a Mail/Express train from Gadag Junction (GDG) to Chhatrapati Shivaji Maharaj Terminus (CSMT). It runs daily, leaves at 13:40 and reaches Chhatrapati Shivaji Maharaj Terminus at 05:10 on day 2 after 15 h 30 min, with 13 stops. Timetable as of September 2026.

Type
Mail/Express
Runs on
Daily Days of departure from Gadag Junction
From
Gadag Junction (GDG) Departs 13:40
To
Chhatrapati Shivaji Maharaj Terminus (CSMT) Arrives 05:10 on Day 2 Open on the Mumbai local train map
Travel time
15 h 30 min
Stops
13
Timetable
As of September 2026

Track this train in the Taransit app.

Get it on Google Play

Route map of train 11140

Route of train 11140 Gadag - Mumbai CSMT Express from Gadag Junction to Chhatrapati Shivaji Maharaj Terminus, 13 stopsGadagChhatrapati ShivajiMaharaj Terminus
See the route on the India map

Stops and times of train 11140

Stops of train 11140
#StationArrivesDepartsHaltDay
1Gadag Junction GDG13:40Day 1
2Badami BDM14:3914:401 minDay 1
3Bagalkot Junction BGK15:2815:302 minDay 1
4Vijayapura (Bijapur) BJP17:4017:455 minDay 1
5Solapur SUR21:0521:105 minDay 1
6Kurduvadi Junction KWV22:1522:172 minDay 1
7Pune Junction PUNE01:2501:305 minDay 2
8Lonavala LNL02:2302:252 minDay 2
9Karjat Junction KJT03:1303:152 minDay 2
10Kalyan Junction KYN03:5804:002 minDay 2
11Thane TNA04:1604:182 minDay 2
12Dadar Western DDR04:4304:452 minDay 2
13Chhatrapati Shivaji Maharaj Terminus CSMT05:10Day 2

Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.

Spotted a wrong time? Email us

Questions about train 11140

What is the route of train 11140?

Train 11140 Gadag - Mumbai CSMT Express runs from Gadag Junction (GDG) to Chhatrapati Shivaji Maharaj Terminus (CSMT), with 13 stops.

On which days does train 11140 run?

Train 11140 leaves Gadag Junction daily.

What time does train 11140 leave Gadag Junction and reach Chhatrapati Shivaji Maharaj Terminus?

Train 11140 leaves Gadag Junction at 13:40 and reaches Chhatrapati Shivaji Maharaj Terminus at 05:10 on day 2. Times are scheduled times in IST.

How long does train 11140 take?

Train 11140 takes 15 h 30 min from Gadag Junction to Chhatrapati Shivaji Maharaj Terminus.

Which stations does train 11140 stop at?

Train 11140 stops at 13 stations: Gadag Junction, Badami, Bagalkot Junction, Vijayapura (Bijapur), Solapur, Kurduvadi Junction, Pune Junction, Lonavala, Karjat Junction, Kalyan Junction and 3 more, listed in the stop table.

Track this train in the Taransit app.

Get it on Google Play

Free on Android