12726 Siddhaganga SF Express route and timetable

12726 Siddhaganga SF Express is a Superfast train from Dharwad (DWR) to KSR Bengaluru City Junction (SBC). It runs daily, leaves at 05:15 and reaches KSR Bengaluru City Junction at 14:05 the same day after 8 h 50 min, with 18 stops. Timetable as of September 2026.

Type
Superfast
Runs on
Daily Days of departure from Dharwad
From
Dharwad (DWR) Departs 05:15
To
KSR Bengaluru City Junction (SBC) Arrives 14:05 on Day 1
Travel time
8 h 50 min
Stops
18
Timetable
As of September 2026

Track this train in the Taransit app.

Get it on Google Play

Route map of train 12726

Route of train 12726 Siddhaganga SF Express from Dharwad to KSR Bengaluru City Junction, 18 stopsDharwadKSR Bengaluru City
See the route on the India map

Stops and times of train 12726

Stops of train 12726
#StationArrivesDepartsHaltDay
1Dharwad DWR05:15Day 1
2Hubballi Junction (Hubli) UBL05:5006:0010 minDay 1
3Yalvigi YLG06:3906:401 minDay 1
4Haveri HVR07:0307:052 minDay 1
5Byadgi BYD07:1607:171 minDay 1
6Ranibennur RNR07:3407:351 minDay 1
7Harihar HRR08:0008:022 minDay 1
8Davangere DVG08:1808:202 minDay 1
9Chikjajur Junction JRU08:5909:001 minDay 1
10Hosadurga Road HSD09:2709:281 minDay 1
11Ajjampura AJP09:4709:481 minDay 1
12Birur Junction RRB10:0510:072 minDay 1
13Kadur Junction DRU10:1610:171 minDay 1
14Arsikere Junction ASK10:5511:005 minDay 1
15Tiptur TTR11:2311:252 minDay 1
16Tumakuru (Tumkur) TK12:2812:302 minDay 1
17Yesvantpur Junction YPR13:2813:302 minDay 1
18KSR Bengaluru City Junction SBC14:05Day 1

Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.

Spotted a wrong time? Email us

Questions about train 12726

What is the route of train 12726?

Train 12726 Siddhaganga SF Express runs from Dharwad (DWR) to KSR Bengaluru City Junction (SBC), with 18 stops.

On which days does train 12726 run?

Train 12726 leaves Dharwad daily.

What time does train 12726 leave Dharwad and reach KSR Bengaluru City Junction?

Train 12726 leaves Dharwad at 05:15 and reaches KSR Bengaluru City Junction at 14:05 the same day. Times are scheduled times in IST.

How long does train 12726 take?

Train 12726 takes 8 h 50 min from Dharwad to KSR Bengaluru City Junction.

Which stations does train 12726 stop at?

Train 12726 stops at 18 stations: Dharwad, Hubballi Junction (Hubli), Yalvigi, Haveri, Byadgi, Ranibennur, Harihar, Davangere, Chikjajur Junction, Hosadurga Road and 8 more, listed in the stop table.

Track this train in the Taransit app.

Get it on Google Play

Free on Android