12829 MGR Chennai Central - Bhubaneswar Superfast Express route and timetable
12829 MGR Chennai Central - Bhubaneswar Superfast Express is a Superfast train from MGR Chennai Central (MAS) to Bhubaneswar (BBS). It runs on Fri, leaves at 21:10 and reaches Bhubaneswar at 17:25 on day 2 after 20 h 15 min, with 21 stops. Timetable as of September 2026.
- Type
- Superfast
- Runs on
- Fri Days of departure from MGR Chennai Central
- From
- MGR Chennai Central (MAS) Departs 21:10
- To
- Bhubaneswar (BBS) Arrives 17:25 on Day 2
- Travel time
- 20 h 15 min
- Stops
- 21
- Timetable
- As of September 2026
Route map of train 12829

Stops and times of train 12829
| # | Station | Arrives | Departs | Halt | Day |
|---|---|---|---|---|---|
| 1 | MGR Chennai Central MAS | 21:10 | Day 1 | ||
| 2 | Sullurupeta SPE | 22:23 | 22:25 | 2 min | Day 1 |
| 3 | Gudur Junction GDR | 23:15 | 23:20 | 5 min | Day 1 |
| 4 | Nellore NLR | 23:49 | 23:50 | 1 min | Day 1 |
| 5 | Ongole OGL | 01:14 | 01:15 | 1 min | Day 2 |
| 6 | Chirala CLX | 01:53 | 01:55 | 2 min | Day 2 |
| 7 | Tenali Junction TEL | 02:33 | 02:35 | 2 min | Day 2 |
| 8 | Vijayawada Junction BZA | 03:55 | 04:05 | 10 min | Day 2 |
| 9 | Eluru EE | 04:41 | 04:42 | 1 min | Day 2 |
| 10 | Tadepalligudem TDD | 05:24 | 05:25 | 1 min | Day 2 |
| 11 | Rajahmundry RJY | 06:20 | 06:22 | 2 min | Day 2 |
| 12 | Tuni TUNI | 07:38 | 07:39 | 1 min | Day 2 |
| 13 | Anakapalle AKP | 08:38 | 08:39 | 1 min | Day 2 |
| 14 | Visakhapatnam Junction VSKP | 10:20 | 10:40 | 20 min | Day 2 |
| 15 | Vizianagaram Junction VZM | 11:40 | 11:42 | 2 min | Day 2 |
| 16 | Srikakulam Road CHE | 12:38 | 12:40 | 2 min | Day 2 |
| 17 | Palasa PSA | 13:43 | 13:45 | 2 min | Day 2 |
| 18 | Brahmapur BAM | 14:43 | 14:45 | 2 min | Day 2 |
| 19 | Balugaon BALU | 15:43 | 15:45 | 2 min | Day 2 |
| 20 | Khurda Road Junction KUR | 16:50 | 16:55 | 5 min | Day 2 |
| 21 | Bhubaneswar BBS | 17:25 | Day 2 |
Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.
Spotted a wrong time? Email us
Return train
- 12830 Bhubaneswar - MGR Chennai Central SF Express Leaves Bhubaneswar 12:00 · Thu
More trains from MGR Chennai Central
- 16031 Andaman Express To Shri Mata Vaishno Devi Katra · leaves 05:15 · Wed, Thu, Sun
- 16093 MGR Chennai Central - Lucknow Jn. (Gomti Sagar) Express To Lucknow Junction Ner · leaves 05:15 · Tue, Sat
- 12007 MGR Chennai Central - Mysuru Shatabdi Express To Mysuru Junction (Mysore) · leaves 06:00 · Mon, Tue, Thu, Fri, Sat, Sun
- 12433 M.G.R Chennai Central - Hazrat Nizamuddin Rajdhani Express To Hazrat Nizamuddin · leaves 06:05 · Fri, Sun
- 12611 MGR Chennai Central - Hazrat Nizamuddin Garib Rath Express To Hazrat Nizamuddin · leaves 06:05 · Sat
- 12675 Kovai SF Express To Coimbatore Main Junction · leaves 06:10 · Daily
- 16057 Sapthagiri Express To Tirupati Main · leaves 06:25 · Daily
- 12269 M.G.R Chennai Central - Hazrat Nizamuddin Duronto Express To Hazrat Nizamuddin · leaves 06:40 · Mon, Fri
Questions about train 12829
What is the route of train 12829?
Train 12829 MGR Chennai Central - Bhubaneswar Superfast Express runs from MGR Chennai Central (MAS) to Bhubaneswar (BBS), with 21 stops.
On which days does train 12829 run?
Train 12829 leaves MGR Chennai Central on Fri.
What time does train 12829 leave MGR Chennai Central and reach Bhubaneswar?
Train 12829 leaves MGR Chennai Central at 21:10 and reaches Bhubaneswar at 17:25 on day 2. Times are scheduled times in IST.
How long does train 12829 take?
Train 12829 takes 20 h 15 min from MGR Chennai Central to Bhubaneswar.
Which stations does train 12829 stop at?
Train 12829 stops at 21 stations: MGR Chennai Central, Sullurupeta, Gudur Junction, Nellore, Ongole, Chirala, Tenali Junction, Vijayawada Junction, Eluru, Tadepalligudem and 11 more, listed in the stop table.