12829 MGR Chennai Central - Bhubaneswar Superfast Express route and timetable

12829 MGR Chennai Central - Bhubaneswar Superfast Express is a Superfast train from MGR Chennai Central (MAS) to Bhubaneswar (BBS). It runs on Fri, leaves at 21:10 and reaches Bhubaneswar at 17:25 on day 2 after 20 h 15 min, with 21 stops. Timetable as of September 2026.

Type
Superfast
Runs on
Fri Days of departure from MGR Chennai Central
From
MGR Chennai Central (MAS) Departs 21:10
To
Bhubaneswar (BBS) Arrives 17:25 on Day 2
Travel time
20 h 15 min
Stops
21
Timetable
As of September 2026

Track this train in the Taransit app.

Get it on Google Play

Route map of train 12829

Route of train 12829 MGR Chennai Central - Bhubaneswar Superfast Express from MGR Chennai Central to Bhubaneswar, 21 stopsMGR ChennaiCentralBhubaneswar
See the route on the India map

Stops and times of train 12829

Stops of train 12829
#StationArrivesDepartsHaltDay
1MGR Chennai Central MAS21:10Day 1
2Sullurupeta SPE22:2322:252 minDay 1
3Gudur Junction GDR23:1523:205 minDay 1
4Nellore NLR23:4923:501 minDay 1
5Ongole OGL01:1401:151 minDay 2
6Chirala CLX01:5301:552 minDay 2
7Tenali Junction TEL02:3302:352 minDay 2
8Vijayawada Junction BZA03:5504:0510 minDay 2
9Eluru EE04:4104:421 minDay 2
10Tadepalligudem TDD05:2405:251 minDay 2
11Rajahmundry RJY06:2006:222 minDay 2
12Tuni TUNI07:3807:391 minDay 2
13Anakapalle AKP08:3808:391 minDay 2
14Visakhapatnam Junction VSKP10:2010:4020 minDay 2
15Vizianagaram Junction VZM11:4011:422 minDay 2
16Srikakulam Road CHE12:3812:402 minDay 2
17Palasa PSA13:4313:452 minDay 2
18Brahmapur BAM14:4314:452 minDay 2
19Balugaon BALU15:4315:452 minDay 2
20Khurda Road Junction KUR16:5016:555 minDay 2
21Bhubaneswar BBS17:25Day 2

Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.

Spotted a wrong time? Email us

Questions about train 12829

What is the route of train 12829?

Train 12829 MGR Chennai Central - Bhubaneswar Superfast Express runs from MGR Chennai Central (MAS) to Bhubaneswar (BBS), with 21 stops.

On which days does train 12829 run?

Train 12829 leaves MGR Chennai Central on Fri.

What time does train 12829 leave MGR Chennai Central and reach Bhubaneswar?

Train 12829 leaves MGR Chennai Central at 21:10 and reaches Bhubaneswar at 17:25 on day 2. Times are scheduled times in IST.

How long does train 12829 take?

Train 12829 takes 20 h 15 min from MGR Chennai Central to Bhubaneswar.

Which stations does train 12829 stop at?

Train 12829 stops at 21 stations: MGR Chennai Central, Sullurupeta, Gudur Junction, Nellore, Ongole, Chirala, Tenali Junction, Vijayawada Junction, Eluru, Tadepalligudem and 11 more, listed in the stop table.

Track this train in the Taransit app.

Get it on Google Play

Free on Android