17313 Hubballi - MGR Chennai Central Express (via Ballari) route and timetable

17313 Hubballi - MGR Chennai Central Express (via Ballari) is a Mail/Express train from Hubballi Junction (Hubli, UBL) to MGR Chennai Central (MAS). It runs on Tue and Fri, leaves at 21:05 and reaches MGR Chennai Central at 10:50 on day 2 after 13 h 45 min, with 10 stops. Timetable as of September 2026.

Type
Mail/Express
Runs on
Tue, Fri Days of departure from Hubballi Junction (Hubli)
From
Hubballi Junction (Hubli, UBL) Departs 21:05
To
MGR Chennai Central (MAS) Arrives 10:50 on Day 2
Travel time
13 h 45 min
Stops
10
Timetable
As of September 2026

Track this train in the Taransit app.

Get it on Google Play

Route map of train 17313

Route of train 17313 Hubballi - MGR Chennai Central Express (via Ballari) from Hubballi Junction (Hubli) to MGR Chennai Central, 10 stopsHubballi (Hubli)MGR ChennaiCentral
See the route on the India map

Stops and times of train 17313

Stops of train 17313
#StationArrivesDepartsHaltDay
1Hubballi Junction (Hubli) UBL21:05Day 1
2Gadag Junction GDG22:1022:122 minDay 1
3Koppal KBL23:0223:042 minDay 1
4Hosapete Junction (Hospet) HPT23:4023:455 minDay 1
5Ballari Junction (Bellary) BAY01:2501:305 minDay 2
6Guntakal Junction GTL02:2502:305 minDay 2
7Kadapa (Cuddapah) HX05:1305:152 minDay 2
8Renigunta Junction RU07:5508:005 minDay 2
9Arakkonam Junction AJJ09:0809:102 minDay 2
10MGR Chennai Central MAS10:50Day 2

Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.

Spotted a wrong time? Email us

Questions about train 17313

What is the route of train 17313?

Train 17313 Hubballi - MGR Chennai Central Express (via Ballari) runs from Hubballi Junction (Hubli, UBL) to MGR Chennai Central (MAS), with 10 stops.

On which days does train 17313 run?

Train 17313 leaves Hubballi Junction (Hubli) on Tue and Fri.

What time does train 17313 leave Hubballi Junction (Hubli) and reach MGR Chennai Central?

Train 17313 leaves Hubballi Junction (Hubli) at 21:05 and reaches MGR Chennai Central at 10:50 on day 2. Times are scheduled times in IST.

How long does train 17313 take?

Train 17313 takes 13 h 45 min from Hubballi Junction (Hubli) to MGR Chennai Central.

Which stations does train 17313 stop at?

Train 17313 stops at 10 stations: Hubballi Junction (Hubli), Gadag Junction, Koppal, Hosapete Junction (Hospet), Ballari Junction (Bellary), Guntakal Junction, Kadapa (Cuddapah), Renigunta Junction, Arakkonam Junction and MGR Chennai Central.

Track this train in the Taransit app.

Get it on Google Play

Free on Android