22879 Bhubaneswar - Tirupati SF Express route and timetable

22879 Bhubaneswar - Tirupati SF Express is a Superfast train from Bhubaneswar (BBS) to Tirupati Main (TPTY). It runs on Sat, leaves at 12:00 and reaches Tirupati Main at 08:45 on day 2 after 20 h 45 min, with 21 stops. Timetable as of September 2026.

Type
Superfast
Runs on
Sat Days of departure from Bhubaneswar
From
Bhubaneswar (BBS) Departs 12:00
To
Tirupati Main (TPTY) Arrives 08:45 on Day 2
Travel time
20 h 45 min
Stops
21
Timetable
As of September 2026

Track this train in the Taransit app.

Get it on Google Play

Route map of train 22879

Route of train 22879 Bhubaneswar - Tirupati SF Express from Bhubaneswar to Tirupati Main, 21 stopsBhubaneswarTirupati Main
See the route on the India map

Stops and times of train 22879

Stops of train 22879
#StationArrivesDepartsHaltDay
1Bhubaneswar BBS12:00Day 1
2Khurda Road Junction KUR12:2512:305 minDay 1
3Balugaon BALU13:1913:212 minDay 1
4Chatrapur CAP14:0314:052 minDay 1
5Brahmapur BAM14:2514:305 minDay 1
6Ichchapuram IPM14:5114:532 minDay 1
7Sompeta SPT15:0915:112 minDay 1
8Palasa PSA15:4815:502 minDay 1
9Srikakulam Road CHE16:4316:452 minDay 1
10Vizianagaram Junction VZM17:4017:455 minDay 1
11Visakhapatnam Junction VSKP18:4519:0520 minDay 1
12Duvvada DVD19:4019:422 minDay 1
13Samalkot Junction SLO21:2921:301 minDay 1
14Rajahmundry RJY22:0522:072 minDay 1
15Eluru EE23:1923:201 minDay 1
16Vijayawada Junction BZA01:4501:5510 minDay 2
17Ongole OGL03:5103:521 minDay 2
18Nellore NLR05:0705:081 minDay 2
19Gudur Junction GDR06:3806:402 minDay 2
20Renigunta Junction RU08:0808:102 minDay 2
21Tirupati Main TPTY08:45Day 2

Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.

Spotted a wrong time? Email us

Questions about train 22879

What is the route of train 22879?

Train 22879 Bhubaneswar - Tirupati SF Express runs from Bhubaneswar (BBS) to Tirupati Main (TPTY), with 21 stops.

On which days does train 22879 run?

Train 22879 leaves Bhubaneswar on Sat.

What time does train 22879 leave Bhubaneswar and reach Tirupati Main?

Train 22879 leaves Bhubaneswar at 12:00 and reaches Tirupati Main at 08:45 on day 2. Times are scheduled times in IST.

How long does train 22879 take?

Train 22879 takes 20 h 45 min from Bhubaneswar to Tirupati Main.

Which stations does train 22879 stop at?

Train 22879 stops at 21 stations: Bhubaneswar, Khurda Road Junction, Balugaon, Chatrapur, Brahmapur, Ichchapuram, Sompeta, Palasa, Srikakulam Road, Vizianagaram Junction and 11 more, listed in the stop table.

Track this train in the Taransit app.

Get it on Google Play

Free on Android