55140 Shahganj - Ballia Passenger route and timetable
55140 Shahganj - Ballia Passenger is a Passenger train from Shahganj Junction (SHG) to Ballia (BUI). It runs daily, leaves at 15:20 and reaches Ballia at 22:30 the same day after 7 h 10 min, with 26 stops. Timetable as of September 2026.
- Type
- Passenger
- Runs on
- Daily Days of departure from Shahganj Junction
- From
- Shahganj Junction (SHG) Departs 15:20
- To
- Ballia (BUI) Arrives 22:30 on Day 1
- Travel time
- 7 h 10 min
- Stops
- 26
- Timetable
- As of September 2026
Route map of train 55140

Stops and times of train 55140
| # | Station | Arrives | Departs | Halt | Day |
|---|---|---|---|---|---|
| 1 | Shahganj Junction SHG | 15:20 | Day 1 | ||
| 2 | Khanja Halt KHJA | 15:30 | 15:31 | 1 min | Day 1 |
| 3 | Didarganj Road DJD | 15:38 | 15:40 | 2 min | Day 1 |
| 4 | Khorason Road KRND | 15:56 | 15:58 | 2 min | Day 1 |
| 5 | Sarai Mir SMZ | 16:06 | 16:08 | 2 min | Day 1 |
| 6 | Sanjarpur SJER | 16:15 | 16:16 | 1 min | Day 1 |
| 7 | Phariha PHY | 16:21 | 16:23 | 2 min | Day 1 |
| 8 | Sarai Rani RKS | 16:32 | 16:34 | 2 min | Day 1 |
| 9 | Azamgarh AMH | 17:10 | 17:15 | 5 min | Day 1 |
| 10 | Sidhari Halt SDHA | 17:18 | 17:19 | 1 min | Day 1 |
| 11 | Sathiaon SAA | 17:27 | 17:29 | 2 min | Day 1 |
| 12 | Muhammadabad MMA | 17:37 | 17:39 | 2 min | Day 1 |
| 13 | Khurahat KRT | 17:48 | 17:50 | 2 min | Day 1 |
| 14 | Paligarh PLGH | 17:57 | 17:58 | 1 min | Day 1 |
| 15 | Mau Junction MAU | 18:20 | 18:30 | 10 min | Day 1 |
| 16 | Indara Junction IAA | 18:42 | 18:47 | 5 min | Day 1 |
| 17 | Haldharpur HLP | 18:53 | 18:55 | 2 min | Day 1 |
| 18 | Ratanpura RTP | 19:03 | 19:05 | 2 min | Day 1 |
| 19 | Rajmalpur Road RJMP | 19:13 | 19:15 | 2 min | Day 1 |
| 20 | Rasra RSR | 19:28 | 19:30 | 2 min | Day 1 |
| 21 | Sanwara SNRA | 19:36 | 19:38 | 2 min | Day 1 |
| 22 | Chilkahar CHR | 19:58 | 20:00 | 2 min | Day 1 |
| 23 | Jigni Khas JGKS | 20:09 | 20:10 | 1 min | Day 1 |
| 24 | Phephna Junction PEP | 21:03 | 21:05 | 2 min | Day 1 |
| 25 | Sagarpali SVI | 21:28 | 21:30 | 2 min | Day 1 |
| 26 | Ballia BUI | 22:30 | Day 1 |
Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.
Spotted a wrong time? Email us
Return train
- 55139 Ballia - Shahganj Passenger Leaves Ballia 17:10 · Daily
Other trains on this route
- 55138 Shahganj - Ballia Passenger Leaves 06:10 · Daily
Questions about train 55140
What is the route of train 55140?
Train 55140 Shahganj - Ballia Passenger runs from Shahganj Junction (SHG) to Ballia (BUI), with 26 stops.
On which days does train 55140 run?
Train 55140 leaves Shahganj Junction daily.
What time does train 55140 leave Shahganj Junction and reach Ballia?
Train 55140 leaves Shahganj Junction at 15:20 and reaches Ballia at 22:30 the same day. Times are scheduled times in IST.
How long does train 55140 take?
Train 55140 takes 7 h 10 min from Shahganj Junction to Ballia.
Which stations does train 55140 stop at?
Train 55140 stops at 26 stations: Shahganj Junction, Khanja Halt, Didarganj Road, Khorason Road, Sarai Mir, Sanjarpur, Phariha, Sarai Rani, Azamgarh, Sidhari Halt and 16 more, listed in the stop table.