56912 Hubballi - KSR Bengaluru Passenger route and timetable

56912 Hubballi - KSR Bengaluru Passenger is a Passenger train from Hubballi Junction (Hubli, UBL) to KSR Bengaluru City Junction (SBC). It runs daily, leaves at 17:30 and reaches KSR Bengaluru City Junction at 05:15 on day 2 after 11 h 45 min, with 37 stops. Timetable as of September 2026.

Type
Passenger
Runs on
Daily Days of departure from Hubballi Junction (Hubli)
From
Hubballi Junction (Hubli, UBL) Departs 17:30
To
KSR Bengaluru City Junction (SBC) Arrives 05:15 on Day 2
Travel time
11 h 45 min
Stops
37
Timetable
As of September 2026

Track this train in the Taransit app.

Get it on Google Play

Route map of train 56912

Route of train 56912 Hubballi - KSR Bengaluru Passenger from Hubballi Junction (Hubli) to KSR Bengaluru City Junction, 37 stopsHubballi (Hubli)KSR Bengaluru City
See the route on the India map

Stops and times of train 56912

Stops of train 56912
#StationArrivesDepartsHaltDay
1Hubballi Junction (Hubli) UBL17:30Day 1
2Kundgol KNO17:5217:531 minDay 1
3Saunshi SNH18:0418:051 minDay 1
4Gudgeri GDI18:1918:201 minDay 1
5Kalas Halt KALS18:2418:251 minDay 1
6Yalvigi YLG18:3218:331 minDay 1
7Savanur SVNR18:4218:431 minDay 1
8Kalsur KVS18:4918:501 minDay 1
9Karajgi KJG18:5919:001 minDay 1
10Haveri HVR19:0819:102 minDay 1
11Byadgi BYD19:2419:251 minDay 1
12Devargudda DAD19:3919:401 minDay 1
13Ranibennur RNR19:4819:502 minDay 1
14Chalgeri CLI20:0220:031 minDay 1
15Harihar HRR20:2520:305 minDay 1
16Davangere DVG20:5821:002 minDay 1
17Kodaganur KAG21:1921:201 minDay 1
18Mayakonda MYK21:2921:301 minDay 1
19Chikjajur Junction JRU22:4022:5010 minDay 1
20Holalkere HLK23:0223:031 minDay 1
21Ramagiri RGI23:1523:161 minDay 1
22Hosadurga Road HSD23:2823:291 minDay 1
23Shivani SHV23:4123:421 minDay 1
24Ajjampura AJP23:5223:553 minDay 1
25Birur Junction RRB00:1300:152 minDay 2
26Kadur Junction DRU00:2300:252 minDay 2
27Arsikere Junction ASK01:1501:205 minDay 2
28Tiptur TTR01:4401:451 minDay 2
29Ammasandra AMSA02:1402:151 minDay 2
30Gubbi GBB02:4402:451 minDay 2
31Tumakuru (Tumkur) TK03:0803:102 minDay 2
32Kyatsandra KIAT03:1703:181 minDay 2
33Dodbele DBL03:4403:451 minDay 2
34Chikka Banavara Junction BAW04:0904:101 minDay 2
35Yesvantpur Junction YPR04:2804:302 minDay 2
36Malleswaram MWM04:3804:402 minDay 2
37KSR Bengaluru City Junction SBC05:15Day 2

Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.

Spotted a wrong time? Email us

Questions about train 56912

What is the route of train 56912?

Train 56912 Hubballi - KSR Bengaluru Passenger runs from Hubballi Junction (Hubli, UBL) to KSR Bengaluru City Junction (SBC), with 37 stops.

On which days does train 56912 run?

Train 56912 leaves Hubballi Junction (Hubli) daily.

What time does train 56912 leave Hubballi Junction (Hubli) and reach KSR Bengaluru City Junction?

Train 56912 leaves Hubballi Junction (Hubli) at 17:30 and reaches KSR Bengaluru City Junction at 05:15 on day 2. Times are scheduled times in IST.

How long does train 56912 take?

Train 56912 takes 11 h 45 min from Hubballi Junction (Hubli) to KSR Bengaluru City Junction.

Which stations does train 56912 stop at?

Train 56912 stops at 37 stations: Hubballi Junction (Hubli), Kundgol, Saunshi, Gudgeri, Kalas Halt, Yalvigi, Savanur, Kalsur, Karajgi, Haveri and 27 more, listed in the stop table.

Track this train in the Taransit app.

Get it on Google Play

Free on Android