57145 Dornakal - Bhadrachalam Road Passenger route and timetable
57145 Dornakal - Bhadrachalam Road Passenger is a Passenger train from Dornakal Junction (DKJ) to Bhadrachalam Road (BDCR). It runs daily, leaves at 08:20 and reaches Bhadrachalam Road at 09:35 the same day after 1 h 15 min, with 8 stops. Timetable as of September 2026.
- Type
- Passenger
- Runs on
- Daily Days of departure from Dornakal Junction
- From
- Dornakal Junction (DKJ) Departs 08:20
- To
- Bhadrachalam Road (BDCR) Arrives 09:35 on Day 1
- Travel time
- 1 h 15 min
- Stops
- 8
- Timetable
- As of September 2026
Route map of train 57145

Stops and times of train 57145
| # | Station | Arrives | Departs | Halt | Day |
|---|---|---|---|---|---|
| 1 | Dornakal Junction DKJ | 08:20 | Day 1 | ||
| 2 | Pocharam PCZ | 08:28 | 08:29 | 1 min | Day 1 |
| 3 | Karepalli KRA | 08:35 | 08:36 | 1 min | Day 1 |
| 4 | Gandhipuram Halt GHPU | 08:43 | 08:44 | 1 min | Day 1 |
| 5 | Chimal Pahad CMW | 08:51 | 08:52 | 1 min | Day 1 |
| 6 | Tadakalpudi TPY | 09:01 | 09:02 | 1 min | Day 1 |
| 7 | Bethampudi BTPD | 09:10 | 09:11 | 1 min | Day 1 |
| 8 | Bhadrachalam Road BDCR | 09:35 | Day 1 |
Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.
Spotted a wrong time? Email us
Return train
- 57146 Bhadrachalam Road - Dornakal Passenger Leaves Bhadrachalam Road 17:30 · Daily
More trains from Dornakal Junction
- 67271 Dornakal - Vijayawada MEMU To Vijayawada Junction · leaves 09:00 · Daily
- 67270 Dornakal - Kazipet MEMU To Kazipet Junction · leaves 21:10 · Daily
Questions about train 57145
What is the route of train 57145?
Train 57145 Dornakal - Bhadrachalam Road Passenger runs from Dornakal Junction (DKJ) to Bhadrachalam Road (BDCR), with 8 stops.
On which days does train 57145 run?
Train 57145 leaves Dornakal Junction daily.
What time does train 57145 leave Dornakal Junction and reach Bhadrachalam Road?
Train 57145 leaves Dornakal Junction at 08:20 and reaches Bhadrachalam Road at 09:35 the same day. Times are scheduled times in IST.
How long does train 57145 take?
Train 57145 takes 1 h 15 min from Dornakal Junction to Bhadrachalam Road.
Which stations does train 57145 stop at?
Train 57145 stops at 8 stations: Dornakal Junction, Pocharam, Karepalli, Gandhipuram Halt, Chimal Pahad, Tadakalpudi, Bethampudi and Bhadrachalam Road.