63287 Barauni - Patliputra MEMU route and timetable

63287 Barauni - Patliputra MEMU is a MEMU train from Barauni Junction (BJU) to Patliputra Junction (PPTA). It runs daily, leaves at 06:15 and reaches Patliputra Junction at 10:15 the same day after 4 h 0 min, with 23 stops. Timetable as of September 2026.

Type
MEMU
Runs on
Daily Days of departure from Barauni Junction
From
Barauni Junction (BJU) Departs 06:15
To
Patliputra Junction (PPTA) Arrives 10:15 on Day 1
Travel time
4 h 0 min
Stops
23
Timetable
As of September 2026

Track this train in the Taransit app.

Get it on Google Play

Route map of train 63287

Route of train 63287 Barauni - Patliputra MEMU from Barauni Junction to Patliputra Junction, 23 stopsBarauniPatliputra
See the route on the India map

Stops and times of train 63287

Stops of train 63287
#StationArrivesDepartsHaltDay
1Barauni Junction BJU06:15Day 1
2Barauni Flag BUJ06:2006:211 minDay 1
3Teghra TGA06:2706:292 minDay 1
4Majnupur Nawada MPNH06:3606:371 minDay 1
5Bachhwara Junction BCA06:4406:462 minDay 1
6Vidyapatidham VPDA07:0407:062 minDay 1
7Harpur Bochaha HBP07:1307:141 minDay 1
8Mohiuddinnagar MOG07:1907:212 minDay 1
9Nandani Lagunia NNNL07:3207:342 minDay 1
10Shahpur Patoree SPP07:4007:422 minDay 1
11Basudeopur Chandail Halt BDUA07:4807:491 minDay 1
12Mehnar Road MNO07:5307:552 minDay 1
13Sahadai Buzurg SDG08:0108:032 minDay 1
14Desari DES08:0908:112 minDay 1
15Gram Kharika Halt GKHT08:1708:181 minDay 1
16Chak Sikandar CSR08:2208:242 minDay 1
17Akshaywat Rai Nagar AYRN08:3608:382 minDay 1
18Chakmakrand CKRD08:4408:462 minDay 1
19Hajipur Junction HJP09:2309:252 minDay 1
20Sonpur Junction SEE09:3309:352 minDay 1
21Bharpura Pahleza Ghat Junction PHLG09:5009:522 minDay 1
22Digha Bridge Halt DGBH10:0410:051 minDay 1
23Patliputra Junction PPTA10:15Day 1

Times are scheduled times from the Taransit timetable as of September 2026 and may have changed. Lines on the map are drawn straight between stations.

Spotted a wrong time? Email us

Questions about train 63287

What is the route of train 63287?

Train 63287 Barauni - Patliputra MEMU runs from Barauni Junction (BJU) to Patliputra Junction (PPTA), with 23 stops.

On which days does train 63287 run?

Train 63287 leaves Barauni Junction daily.

What time does train 63287 leave Barauni Junction and reach Patliputra Junction?

Train 63287 leaves Barauni Junction at 06:15 and reaches Patliputra Junction at 10:15 the same day. Times are scheduled times in IST.

How long does train 63287 take?

Train 63287 takes 4 h 0 min from Barauni Junction to Patliputra Junction.

Which stations does train 63287 stop at?

Train 63287 stops at 23 stations: Barauni Junction, Barauni Flag, Teghra, Majnupur Nawada, Bachhwara Junction, Vidyapatidham, Harpur Bochaha, Mohiuddinnagar, Nandani Lagunia, Shahpur Patoree and 13 more, listed in the stop table.

Track this train in the Taransit app.

Get it on Google Play

Free on Android